Product Description

The multi-stage fixed-point sandblasting perforation and fracturing tool string for the unthreaded casing

A multi-stage point-shot sandblasting perforation and fracturing process tubing string is composed of multiple graded nozzles. During the construction process, perforation, fracturing and ball dropping with slip sleeves are carried out one by one from bottom to top, and the next section of fracturing is performed until all layer sections are completed.

Technical Specifications

  • Perforation hole diameter of the casing: 8-12 mm; Formation hole diameter: 100-160 mm; Depth: approximately 800 mm;
  • Spray gun pressure resistance: 70 MPa; Temperature resistance: 150℃;
  • Construction grade: The maximum number of construction levels for a 51/2″ casing is 10;
  • Construction flow rate: 2-3 m³/min