Product Description

Purpose:

The currently developed main layer is the No. 3 coal seam. Once the gas extraction from the No. 3 layer is completed,

other layers below will be developed. This technological process can effectively avoid the interference of water in the upper layer,

ensuring the normal drainage and gas extraction of the lower-developed layers.

Features: The tool is equipped with an anti-resistance mechanism. It will not seal when encountering soft or hard obstacles; during unsealing, the slips are forcibly retracted, ensuring safe and reliable unsealing.

Multi-layer drainage gas production technology

Main parameters:

Adaptable inner diameter of the casing: Φ124 - Φ127mm

Outer diameter of the tool steel body: Φ115mm