Quality undefinedSoluble bridge plug (third generation) factory

undefinedSoluble bridge plug (third generation)

Soluble Plug (Third Generation) The all-metal soluble plug is a temporary sealing plug made of water-soluble materials. Its unique metal sealing ring design, combined with its large inner diameter, enables it to be used in conjunction with standard cable setting tools, allowing for efficient and ...

Quality Hydraulic sandblasting perforation fracturing technology factory

Hydraulic sandblasting perforation fracturing technology

Hydraulic sandblasting perforation fracturing technology Hydraulic sandblasting perforation fracturing is an integrated production enhancement measure that combines perforation, fracturing, and isolation. It uses multiple stages of fracturing with a single pipe string, improving efficiency and ...

Quality The tubing string for the card-type bottom-sealing drag sandblasting perforation and fracturing process factory

The tubing string for the card-type bottom-sealing drag sandblasting perforation and fracturing process

The pipe column with a swivel bottom seal for drag sandblasting perforation and fracturing process Pipe column composition: connector, dropping head joint, stabilizer, swivel packer, sandblasting gun, etc. Technical features: • Suitable for coiled tubing and conventional tubing operations; • One ...

Quality The multi-stage fixed-point sandblasting perforation and fracturing tool string for the unthreaded casing factory

The multi-stage fixed-point sandblasting perforation and fracturing tool string for the unthreaded casing

The multi-stage fixed-point sandblasting perforation and fracturing tool string for the unthreaded casing Hydraulic jet perforation fracturing has a water-sealing function: By controlling the jetting tool, the location and direction of crack initiation can be accurately selected; after the cracks ...

Quality The old well water-blocking renovation technology (including setting tools, insertion tubes, and fixed-point soluble sealing tools, etc.) factory

The old well water-blocking renovation technology (including setting tools, insertion tubes, and fixed-point soluble sealing tools, etc.)

The old well water-blocking renovation technology (including setting tools, insertion tubes, and fixed-point soluble sealing tools, etc.) Injecting water causes waterlogging, resulting in a low recovery rate of the original layer. It has potential for further exploitation.The water-blocking ...

Quality The concentric dual-tube injection and separation technology with a plug-and-seal device (including telescopic tubes, pre-set water absorption profile tools, drillable-sealing devices, one-way connect factory

The concentric dual-tube injection and separation technology with a plug-and-seal device (including telescopic tubes, pre-set water absorption profile tools, drillable-sealing devices, one-way connect

The concentric dual-tube injection and separation technology with a plug-and-seal device (including telescopic tubes, pre-set water absorption profile tools, drillable-sealing devices, one-way connectors, plug-in sealers, lower-layer water injection sliding sleeves, sand-capturing tubes, etc.)